A multi hatch railcar loading system that spans for about 20 railcars in the middle of two rail tracks.
CARBIS SOLUTIONS Railcar Multiple Hatch System
March 25, 2021
rail and hopper car handrails.
CARBIS SOLUTIONS Railcar Hopper Car Handrail
March 25, 2021

CARBIS SOLUTIONS Unit Train Loading Platforms

Seamless integration for smooth loading operations at your rail spots.

Weigh-Tech can design your rail car loading and unloading facilities to accommodate both coupled and uncoupled rail cars, maximizing your flexibility. Whether you are looking for a simple gantry system, or a complete package featuring cages, loading arms, and spill containment, our team of onsite engineers can design the solution you need, when you need it.

Why Choose Weigh-Tech and Carbis Rail Car Loading systems?

  • Various cage solutions to meet your particular needs, from 12″ handrail to full enclosure.
  • Slip resistant walk surfaces to maximize worker safety.
  • Loading arm integration from design to implementation, ensuring coordination for ease of operation.
  • Available spill containment and grounding solutions for increased safety and compliance.


Unit train loading platform above a tanker railcar.An Important Note On Railcar Fall Protection

While it is very common in this industry to use a 12″ cage to augment the existing crash box and satisfy the OSHA 42″ handrail requirement, we recommend not stopping there. The abbreviated cage does not satisfactorily protect the worker from gaps underneath the railing, thus exposing workers to danger. Please give us a call to discuss how to keep your workers safer as they go about their railcar operations.

Replacement Parts

Replacement parts can be purchased through Weighing Technologies. Please call us at (281) 474-5277 or fill out a request online.